Matre Data Center Site

Good supply of clean energy and a short time-to-market. The site is close to a strong grid connection point and hydro power production site, and can therefore provide dual feed electrical power at 100 MV.

Matre Data Center Site includes several plots of land that are ideal for data centers which leaves a smaller footprint but still requires a lot of power.

Matre is a relatively small neighbourhood built up as an industrial area based on the production of hydropower. This area in western Norway is approximately an 80-minute drive from Bergen’s city centre.

Matre includes several plots of land that are ideal for data centers which require a smaller footprint but still need a lot of electrical power. Today, three industrial sites of 18,000 m² in total stand ready to welcome your data centre. The area could be supplied with 100 MW of electricity, and redundant fibre is offered.

GreenByte is developing other sites in Matre, which will soon be available. 

More on Matre Data Center Site (pdf)

Area

Suitable for: Small and medium-sized co-locations and HPC data centres.
Site in brief: industrial park – greenfield plot. Workshop, office, and dwellings available. Close to a hydropower production area.
Area size: a total of 18 000 m2.
Owner today: cooperation of three sites and owners.
Possible construction start date: 8–10 weeks.
How much of the land is settled/filled: all/filled.
Gradient of the land: flat.
Drainage situation: good.

Power

Electrical power today: 12 MW available within weeks.
Possible upgrade: 100 MW.

Fibre

Fibre situation today: redundant fibre at the grid connection point. Dark fibre & DWDM are available.

With regards to connectivity, data centres located in Greater Bergen can connect to London with a 16,8 ms latency round trip. The same route offers great access to Ireland and the US. Data traffic to mainland Europe will either go through the UK, Sweden or Denmark.

Destinations from Greater Bergen - Round Trip Delay (RTD)

London 16,8ms
Aberdeen 13,7ms
Amsterdam 17ms
Frankfurt 20,5ms
Oslo 7,5ms
Stockholm 14ms
Power Supply 100 MW
Area 25,000m2
Latency Excellent
Time to Market Ready to build