Børdalen Data Center Site

Børdalen is a greenfield data center that is ready-zoned. The site is close to a strong grid connection point and hydro power production site, and can hence provide dual feed electrical power at 100 MV.

Big Data Valley in Børdalen is an excellent place for your data centre. Børdalen, located in Samnanger municipality in western Norway, is a strong junction point in the power grid.

Big Data Valley in Børdalen is an excellent place for your data centre. Børdalen, located in Samnanger municipality in western Norway, is a strong junction point in the power grid. There is also the potential for an additional clean energy supply for the area. Construction could begin in 2019, pending the expected finalisation of the zoning process.

Børdalen is approximately a 40-minute drive from Bergen’s city centre and from the city’s international airport, providing easy access to a range of amenities as well as vital infrastructure. Redundant fibre connectivity is also available.

More on Børdalen Data Center Site (pdf)

Area

Suitable for: hyper-scale, co-location, and HPC data centres.
Site in brief: greenfield plot – ready zoned. Hydropower production area.
Area size: approx. 60 000 m2 in total.
Owner today: REGN Datacenters, commercial infrastructure owner.
Possible construction start date: immediate
How much of the land is settled/filled: none/not filled
Gradient of the land: flat.
Drainage situation: good.

Power

Electrical power available: 100 MW.
Possible upgrade: 200 MW could be made available.

Fibre / Connectivity

Fibre situation today: redundant fibre 300 meters from the site. Operator diversity is possible. Dark fibre & DWDM are available.

With regards to connectivity, data centres located in Greater Bergen can connect to London with a 16,5 ms latency round trip. The same route offers great access to Ireland and the US. Data traffic to mainland Europe will either go through UK, Sweden or Denmark.

Destinations from Greater Bergen - Round Trip Delay (RTD)

London 16.8ms
Aberdeen 13.7ms
Amsterdam 17ms
Frankfurt 20.5ms
Oslo 7.5ms
Stockholm 14ms

 

Power Supply 100 MW
Area 60,000 m2
Latency Excellent
Time to Market Ready to build

Vidar Totland